Industry
The eVTOL Certification Race: Joby Leads, Archer Is in the Final Phase, BETA Trails Behind
By CARC Editorial Team · November 14, 2026 · 4 min read
As of November 11, 2026, none of the companies covered reports holding an FAA type certificate for an electric vertical takeoff and landing aircraft. By their own most recent reports, Joby Aviation and Archer Aviation each say their air taxi is in the final, testing phase of type certification. BETA Technologies reports that its conventional-takeoff electric airplane is well ahead of its eVTOL.
Joby is the only one of the three that reports its own completion and the FAA side by side. In its November 4 shareholder letter, Joby said stages 1 to 3 are at 100 percent on both sides. In stage 4, Joby is at 83 percent and the FAA at 78 percent. In stage 5, Joby is at 25 percent and the FAA at 14 percent, with data as of October 30, 2026. Joby says it is working through the final stage of FAA type certification and that its second vertiport in Dubai is complete, with pilot-on-board flight testing there planned for later this year.
Archer says its Midnight is in the fourth and final phase, the implementation phase, where every compliance finding is made against the means of compliance and test plans agreed with the agency. Archer has not published percentages. BETA is certifying two aircraft and an engine, and its own charts put them in very different places. In its November 3 presentation, the ALIA A250 eVTOL is at 100 percent on phase 1, with means of compliance at 32 percent in phase 2, compliance planning at 6 percent in phase 3, and nothing yet in implementation. Wisk Aero describes its Generation 6 autonomous eVTOL as the design going through FAA certification, with no stage or percentage published.
The FAA public explainer dated April 23, 2026 lays out seven phases shared between the manufacturer and the agency: Standards, Definition, Detail, Build, Test, Certification and Production. Every status figure is a company own claim. The FAA public advanced air mobility pages describe the process and the rules but do not report progress for individual applicants.
Sources: AeroEd, Joby Aviation, Archer Aviation, BETA Technologies